#Contract_launching
#Amount_to_spend: 198 000 000 CFA Francs
Execution of the construction works of a concrete bridge with two ways of 24 ml of scope on the mayo tcharatche pk 26 + 350 from the section of regional road (inter r0414) gargua-barndake-bilassi (nigeria border) in the mayo houna subdivision
#Amount_to_spend: 198 000 000 CFA Francs
Execution of the construction works of a concrete bridge with two ways of 24 ml of scope on the mayo tcharatche pk 26 + 350 from the section of regional road (inter r0414) gargua-barndake-bilassi (nigeria border) in the mayo houna subdivision