#Contract_launching
#Amount_to_spend: 97 500 000 CFA Francs
Construction of an integrated health center in matondo ii lot 2: for the construction of a market hanger / vip toilet in weme lot 3: for the construction of a block of two classrooms at g.n.s ibemi
#Amount_to_spend: 97 500 000 CFA Francs
Construction of an integrated health center in matondo ii lot 2: for the construction of a market hanger / vip toilet in weme lot 3: for the construction of a block of two classrooms at g.n.s ibemi