dukwat
Actualités de -
  • Il y'a 3 ans
    #Marché_lancé
    #Montant_prévu: 100 000 000 FCFA
    Construction d’une tribune a la place des fetes de ndelele et poursuite de la construction du cercle municipal de ndelele
  • Il y'a 3 ans
    #Marché_lancé
    #Montant_prévu: 17 500 000 FCFA
    Construction du foyer de ngotto
  • Il y'a 3 ans
    +3 odds🔥🔥🔥🎁❤️
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 117 000 000 CFA Francs
    Construction of some structures wihinin the buea municipality lot 1: construction of a block of two (2) classrooms g.s. molyko town lot 2: construction of a training center, with office space and modern toilets at the youth center at buea lot 3: construction of a poultry farm for the buea council
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 12 000 000 CFA Francs
    Supply of materials/equipment to some institutions and centers within the buea municipality lot i: the equipment of 3 literacy centers within buea; of balalia, kinge literacy center and manjinja folkore lot il: the equipment in benches, teachers, tables and chairs in some primary school in the buea municipality (g.s. molyko town, g.s. bwassa, g.s. great soppo i, g.s. mapanja and gbps bonduma lot 111: supply of equipment to ceac bokova
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 29 500 000 CFA Francs
    Rehabilitation of some centers in the buea municipality lot 1: rehabilitation ofceac bokova lot 11: rehabilitation ofthe women empowerment center
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 65 000 000 CFA Francs
    Rehabilitation of some roads within the buea municiplity rehabilitation of road from tole through bwiyuku to wonganjo
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 200 000 000 CFA Francs
    Construction of three (03) blocks of twenty six (26) shops and a modern toilet at the central market in buea lot 1: construction of a block a with twenty six (26) shops, and skeletal works of block b with twenty six (26) shops lot 2: finishing works of block b, construction of block c with twenty six (26) shops and the construction of a modern toilets construction
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 69 952 229 CFA Francs
    Construction of a permanent bridge at the entrance to moki garage quarter in buea
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 100 000 000 CFA Francs
    Construction of an amusement park at buea town phase 1
  • «
  • 1
  • ...
  • 3679
  • 3680
  • 3681
  • 3682
  • 3683
  • 3684
  • 3685
  • 3686
  • 3687
  • 3688
  • 3689
  • ...
  • 10250
  • »
Contacts
  • BP: 2034 Yaoundé CMR
  • info@dukwat.com
Suivez nous
  • dukwat
  • dukwat
Liens
  • A propos
  • Conditions d'utilisation
Copyright © 2026 - Dukwat - Tous droits reservés