dukwat
Actualités de Bamenda -
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 35 005 000 CFA Francs
    Construction of the bamenda city council staff club building under emergency procedure
  • Il y'a 3 ans
    #Contract_awarded
    #project's_cost: 19 999 996 CFA Francs
    Supply of benches to g.s abangoh, g.s station, g.s ntoh
  • Il y'a 3 ans
    #Contract_awarded
    #project's_cost: 26 997 604 CFA Francs
    Opening and grading of the road and the construction of culverts from ta tighe's entrance through pa ndifor george - gths bamendankwe 3.5km in bamenda i council area
  • Il y'a 3 ans
    #Contract_awarded
    #project's_cost: 18 475 355 CFA Francs
    Rehabilitation of g.s station in bamenda 1 council area
  • Il y'a 3 ans
    #Contract_awarded
    #project's_cost: 27 499 050 CFA Francs
    Opening and grading of farm to market roads from bangshie market to g.s.s bangshie and from ajaman to nesirine bamenda i council area
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 25 000 000 CFA Francs
    Construction of a community hall in alamatu in bamenda ii councl area
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 14 000 000 CFA Francs
    Construction of a 6m span bridge at akaka quarter phase ii
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 14 710 000 CFA Francs
    Construction of a borehole 10m elevation storage tank (5m 3 ) in mile 8 mankon equipped with a solar pump
  • Il y'a 3 ans
    #Contract_launching
    Construction of a borehole with 10m elevation storage tank (5m 3 ) equipped with a solar pump
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 50 000 000 CFA Francs
    Rural electrification of ndzah village in bamenda iii council area
  • «
  • 1
  • ...
  • 517
  • 518
  • 519
  • 520
  • 521
  • 522
  • 523
  • 524
  • »
Contacts
  • BP: 2034 Yaoundé CMR
  • info@dukwat.com
Suivez nous
  • dukwat
  • dukwat
Liens
  • A propos
  • Conditions d'utilisation
Copyright © 2026 - Dukwat - Tous droits reservés