dukwat
Actualités de Limbe -
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 30 000 000 CFA Francs
    Green space at limbe i (bota)
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 25 000 000 CFA Francs
    Construction of the integrated health centre bonadikombo in the limbe i municipality
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 31 526 473 CFA Francs
    Construction of council restaurant in the limbe i municipality
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 15 200 000 CFA Francs
    General rehabilitation of bota hospital
  • Il y'a 3 ans
    #Marché_lancé
    #Montant_prévu: 50 000 000 FCFA
    Costruction d'un centre de sante integre a man 0' war bay, commune de limbe iii
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 25 000 000 CFA Francs
    Construction of a nursery school block at gpns, mile 4 in the limbe i municipality
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 8 500 000 CFA Francs
    Construction of a borehole equipped with electric pump at makoka within the- limbe i municipality
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 44 710 000 CFA Francs
    For the construction of four 4 borehole equipped with electric pump and storage tanks moliwe,upper mawoh,middle cassava farms and mabeta nlo within the- limbe i municipality
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 20 000 000 CFA Francs
    Construction of a block of two classrooms at g s mawoh in the limbe i municipality 1.
  • Il y'a 3 ans
    #Contract_launching
    #Amount_to_spend: 16 000 000 CFA Francs
    Opening of farm to market road in mawoh from late quarter head's resident tog s mawoh to mbanda black bussh 1km phase ii
  • «
  • 1
  • ...
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • »
Contacts
  • BP: 2034 Yaoundé CMR
  • info@dukwat.com
Suivez nous
  • dukwat
  • dukwat
Liens
  • A propos
  • Conditions d'utilisation
Copyright © 2026 - Dukwat - Tous droits reservés